Extension cost overrun calculator

You have a price from a builder. This works out what that price realistically becomes by the time the job is finished, what the gap is made of, and how much of it was avoidable.

Indicative only — not a quote and not a survey. No contractor, drawings or site inspection sit behind these figures. Ranges are rounded and assume a VAT-registered contractor working on an owner-occupied home in South West London.

The quote
The property and the job
Still undecided or excluded

Tick anything that is not fully priced in the quote you are holding.

While the work runs

Where this quote realistically lands

—

Breakdown of the gap between quote and final cost

The gap, self-managed against managed

Gap, self-managed
Gap, managed

Fix these before you sign

    Send me the quote and I will tell you what is missing from it. No fee for the first conversation.

    What the number actually means

    The figure at the top is not a prediction of your project. It is the range that projects priced the way yours was priced, on a property like yours, tend to land in. Three quotes for the same extension routinely differ by forty per cent, and the final cost of the same job under two different builders can differ by more than that again.

    What the tool is really doing is separating three very different kinds of money, because they behave differently and they are managed differently.

    Scope that was never in the quote

    Kitchens, flooring, decoration, landscaping, professional and statutory fees. This is not overrun in any meaningful sense — it is money you were always going to spend, sitting outside the number in your head. It does not go away when someone manages the project. It simply turns up in January instead of June, while you can still do something about it.

    Variations from what nobody could see

    Foundations that go deeper than the engineer assumed, a drain running where no drawing shows it, joists that will not take the load, a wall that is not carrying what everyone thought it was carrying. Some of this is genuinely unforeseeable. A good deal of it is foreseeable by anyone who has opened up enough Victorian terraces, and most of it is cheaper when it is priced before the work happens rather than after.

    Changes you make once work has started

    The most expensive pound on any renovation is the one spent changing something that has already been built. This bucket is almost entirely within your control, and it is the one that grows fastest when decisions are left open, which is why the calculator weights it against how much of the specification is still undecided.

    Where SW London extension budgets actually go wrong

    1. Comparing quotes that are not describing the same job. The cheapest of three quotes is usually the one that excludes the most. Line them up properly with thebuilder quote comparison checklistbefore you look at the totals.
    2. Treating a provisional sum as a price. A glazing allowance is a placeholder until someone measures the opening and quotes against it. So is a kitchen allowance, a tiling rate and anything described as a PC sum.
    3. Starting before the structural design exists. Steel sizes drive foundations, and foundations drive the groundworks price. Sizing steels after the quote is agreed means repricing the biggest early item on the job.
    4. Paying ahead of the work. Stage payments made on request rather than against completed work remove the only leverage you have when something goes wrong.
    5. Forgetting the programme costs money too. If you are renting, every week of slip has a price. A sixteen-week extension that takes twenty-two is six weeks of rent nobody budgeted for. Seehow long these jobs really take.

    How I keep clients on budget, and where I cannot

    Being honest about the split matters, because it is the difference between a service and a sales pitch. I cannot make the kitchen cheaper, and I will not pretend that finding the missing scope is a saving. What client-side management genuinely changes is the second and third buckets, and the way the first one is discovered.

    • The gaps are found before you commit. The quote gets read line by line against the drawings, and the exclusions get priced while you still have three builders competing and the freedom to change the scope.
    • Variations are priced before they are built. A written variation process, with each change costed and approved in advance, is the single biggest difference between a project that drifts and one that does not.
    • Decisions are front-loaded. Kitchen, glazing, sanitaryware, electrics and finishes chosen before first fix, not during it, so the expensive kind of change never arises.
    • Trade pricing and the right supplier. The same specification bought through trade accounts rather than retail — seewhere the real savings are.
    • Someone on site every week who is not paid by the builder. Problems caught at first fix cost a fraction of the same problem caught at handover.

    The honest caveat: a management fee comes out of the same budget, so on a small, straightforward job with a builder you already trust, the sums may not work. On a six-figure job with several trades and a structural element, they usually do. There is a worked example indoes a project manager’s fee pay for itself, and the fee models are set out onwhat a project manager costs.

    Common questions

    Why do extension quotes go over budget?

    Almost never because the builder priced the work wrongly. The three big causes are things that were never in the quote in the first place (kitchen, flooring, decoration, landscaping, professional fees), things nobody could price until the ground was open or the ceiling was down, and decisions the homeowner changed after the work had started. Only the middle one is genuinely unforeseeable. The other two are visible before anyone signs anything, if someone reads the quote properly.

    How much should I add to a builder’s quote?

    It depends far more on how the quote was put together than on the size of the job. A fully itemised price against approved drawings and a structural design, with the kitchen and glazing already chosen, might land within 8 to 12 per cent. A one-page total against a sketch, with half the finishes undecided, routinely lands 30 to 50 per cent higher by the time the job is finished. The calculator above separates those two situations rather than giving everyone the same percentage.

    Is a 10 per cent contingency enough for an extension?

    Ten per cent is a reasonable allowance for the unforeseeable part — the foundations that go deeper than expected, the drain in the wrong place, the joists that turn out to be undersized. It is not a budget for everything left out of the quote. If your quote excludes flooring, decoration and the kitchen, that is not contingency, that is scope you have not priced yet, and it needs its own line. Keep the two separate or you will spend the contingency before the first variation appears.

    Does the builder’s quote include VAT?

    Check, because it changes the number by a fifth. A new extension to an existing home is standard-rated at 20 per cent VAT where the contractor is VAT-registered. Some quotes show it, some add it at the bottom, and a small builder under the registration threshold will not charge it at all. There are narrow exceptions — for example a reduced rate on a property empty for two years or more — and those are worth checking with your accountant rather than assuming.

    Is this the same as an extension cost calculator?

    No, and they answer different questions. An extension cost calculator works forwards from size and specification to a build cost per square metre, which is what you need before you have any quotes. This one works the other way: you already have a number from a builder, and the question is what that number becomes by the time the job is finished. If you are still at the first stage, the 2026 London extension and loft costs guide on this site is the better starting point.

    Can a project manager actually stop an extension going over budget?

    Not all of it, and anyone claiming otherwise is selling. The scope missing from your quote is money you were always going to spend — a managed project finds it in week zero rather than week twenty, which changes the shock but not the total. What a client-side manager genuinely moves is the other two buckets: variations priced before they are built rather than after, and changes you make mid-build because a decision was left open. On a six-figure renovation that is usually the difference between a difficult month and a serious problem.

    Related

    Do not have a quote yet? Start with the2026 London extension and loft costs guide, or work forwards from size and specification with theextension cost calculator at Chat to Your Builder. Already collecting quotes? Use thequote comparison checklistand theextension and loft budget plannerto build the full budget out properly. Further reading:how much contingency a renovation needs·comparing builder quotes·when a project manager makes sense.

    No quote yet?

    Work forwards from size and specification with the extension cost calculator or the loft conversion cost calculator, and add the professional fees with the renovation fees calculator.

    Got a quote in front of you?

    Send it over before you sign it.

    Phone 07525 474 849 or send the quote and the drawings through. If the answer is that the quote is sound and you do not need me, that is a perfectly good outcome.

    Send me your quote

    Or speak to Ben directly: 07525 474 849 · benmurrell83@gmail.com