Call
Free tool · London · 2026 · Guidance only

Do I need planning permission? A London checker

Answer a few questions about the house and the project (rear or side extension, wraparound, loft dormer, mansard, rooflights or basement) and see which route it is likely to need: permitted development with a Lawful Development Certificate, prior approval, or a full householder planning application. You also get the right council pages to check for your borough.

Guidance only. Not legal advice and not a decision. It applies the national householder rules (GPDO 2015, Schedule 2, Part 1) to your answers. It cannot see Article 4 directions, planning conditions or earlier extensions on your property; only the council can confirm. Rules checked 6 October 2026.

The property
The project
m
m
m³

Limit: 40 m³ on a terraced house, 50 m³ on a semi or detached. Your architect can measure this.

Likely planning route (guidance only)

—

How each rule applies to your answers

    Not sure which way to go? I can look at your house and drawings. No fee for the first conversation.

    The three routes, and what each costs

    Permitted development, confirmed with a Lawful Development Certificate

    Permitted development means the national rules already grant permission, so there is no planning application. I still recommend a Lawful Development Certificate (LDC): it costs£274 for proposed work (half the householder fee), should be decided within 8 weeks of validation, and gives you the paper a buyer’s solicitor will ask for. Building without one is lawful if the scheme really complies, but you carry the risk if it turns out not to.

    Larger home extension prior approval

    A single-storey rear extension between 3 and 6 metres deep (4 to 8 metres on a detached house) can go through prior approval instead of a full application, if the house is not on conservation area or other protected land. It costs £249. The council notifies the neighbours and has 42 days to decide; you cannot start until it approves or the 42 days pass without a decision.

    Householder planning application

    Everything else: anything over the limits, side and two-storey extensions in conservation areas, mansards, front dormers, most new basements, and almost all external work to flats. The fee is£548 in England from 1 April 2026; a draft regulation proposes £575 for applications made on or after 8 December 2026. The target decision time is 8 weeks from validation. How long that really takes borough by borough is inhow long planning permission takes in London.

    Separate from planning: Building Regulations, party walls and listed building consent

    Whatever the planning route, an extension, loft or basement needs Building Regulations approval (see building control fees in London), and work on or near a shared wall needs party wall notices: at least two months before work on the wall itself, one month for excavation near a neighbour’s foundations. A listed building needs listed building consent for alterations that affect its character; there is no application fee for it. For the detail behind the rules, read the permitted development guide for London boroughs, planning for side-return extensions and loft conversion planning.

    Check your property with the council

    These are the pages each council publishes for conservation areas and Article 4 directions. Article 4 directions can apply to a single street or a single house, so check the property, not the area.

    Areas covered: Richmond, Wimbledon,Fulham, Chelsea, Clapham,Balham and the rest of West and South West London.

    How this checker works

    It applies the limits in Classes A (extensions), B (roof enlargements) and C (other roof alterations) of Part 1 of Schedule 2 to the General Permitted Development Order 2015, as in force on 6 October 2026, to the answers you give. Conservation areas count as article 2(3) land, which removes side extensions, two-storey rear extensions, the larger 6 and 8 metre route and all Class B roof enlargements. "Not sure" answers never return a permitted development result: they return "check with the council". Basement answers follow the Planning Portal’s guidance and the borough-wide basement Article 4 directions in Hammersmith & Fulham, Kensington & Chelsea and Westminster. Fees are the England fees from 1 April 2026.

    1. legislation.gov.uk — GPDO 2015, Schedule 2, Part 1 (householder permitted development): Class A (extensions): 3 m / 4 m single-storey rear limit, 6 m / 8 m with prior approval (not on article 2(3) land), 4 m height, 3 m eaves within 2 m of a boundary, side extensions single storey and no wider than half the original house, two-storey 3 m deep and 7 m from the rear boundary, A.2 conservation area exclusions. Class B (roof enlargements): 40 m³ terrace / 50 m³ other, nothing beyond the front roof slope, not on article 2(3) land.
    2. GOV.UK — Permitted development rights for householders: technical guidance: Householder rights do not apply to flats or maisonettes; "original" means as at 1 July 1948 or as first built.
    3. Planning Portal — Lawful Development Certificate: Proposed use or operation: half the normal planning fee. "Should be decided within 8 weeks", starting once the application is validated.
    4. Planning Portal — Fees for Planning Applications in England (from 1 April 2026): Householder application £548; larger home extension prior approval £249; LDC (proposed) half the full fee.
    5. legislation.gov.uk — Explanatory Memorandum, draft Planning Fees (Amendment and Transitional Provision) Regulations 2026: Draft: householder fee proposed to rise from £548 to £575 for applications made on or after 8 December 2026.
    6. Planning Portal — Basements: planning permission: Converting an existing basement: permission unlikely unless a lightwell, new unit or external change. Creating a new basement "will commonly require planning permission".
    7. GOV.UK — The Party Wall etc. Act 1996: explanatory booklet: Notice at least two months before work to an existing party wall; one month before excavating near a neighbour’s foundations or building a new wall on the boundary. No reply within 14 days = a dispute, and surveyors are appointed.
    8. GOV.UK — Building regulations approval: how to apply: Full plans: decision within 5 weeks, or 2 months with your consent. Building notice: start 2 days after submitting. Completion certificate usually within 8 weeks of completion.

    Guidance only. It does not cover trees, highways, flood risk, listed building detail, covenants, freeholder consent or every design condition. Get an LDC or speak to the council before you build.

    Common questions

    Do I need planning permission for a single-storey rear extension in London?

    Not always. On a house that is not a flat, not listed and not in a conservation area or under an Article 4 direction, a single-storey rear extension up to 3 metres deep (4 metres for a detached house) and no more than 4 metres high is normally permitted development. Up to 6 metres (8 metres detached) is possible through the larger home extension prior approval route, which costs £249, but not in a conservation area. Anything bigger needs a householder application, which costs £548.

    Can I build a side-return extension in a conservation area without planning permission?

    No. A side-return infill usually counts as a side extension, and on conservation area land (article 2(3) land in the regulations) a side extension is not permitted development. You need a householder planning application.

    Is a loft dormer permitted development in London?

    Often, on a house outside a conservation area: up to 40 cubic metres of extra roof space on a terraced house and 50 on a semi or detached, nothing beyond the front roof slope facing a road, materials to match, and the dormer set back about 20 centimetres from the eaves. In a conservation area, roof enlargements are not permitted development at all.

    What is a Lawful Development Certificate and do I need one?

    It is a certificate from the council confirming that your proposed work is lawful, usually because it is permitted development. It is optional, but I recommend it on every permitted development project, because buyers’ solicitors ask for proof. For proposed work it costs half the householder fee (£274 from April 2026) and should be decided within 8 weeks of the application being validated.

    Do flats have permitted development rights?

    No. Householder permitted development rights apply to houses only. If you own a flat or maisonette, assume external changes such as an extension, a dormer or new windows of a different style need planning permission, as well as the freeholder’s consent under your lease.

    Does permitted development mean I do not need Building Regulations approval?

    No. Planning and Building Regulations are separate. An extension, loft conversion or basement needs Building Regulations approval whether or not it needs planning permission, and work next to or on a shared wall needs a party wall notice.

    Planning an extension or loft?

    Get the route right before the drawings.

    Phone 07525 474 849 or send me your address and what you have in mind. No fee for the first conversation.

    Discuss your project

    Or speak to Ben directly: 07525 474 849 · benmurrell83@gmail.com